I am plannig to install a capacitor Bank at 69/12.47 kV substation. The bank is 2700 kVAR three stage bank with 900 kVAR in each stages. I am wondering how you estimate the voltage transients due to 900 kVAR capacitor switching?
Substation transformer: 14/20 MVA, Impedance, 9%
Source...
I have been working for capacitor placemnet in our 12.47 kV distribution system for power factor correction. 3 substations that are feeding from a 115 kV radial transmission line have really power factor. Each substation have kVAR demand around 5000 kVAR. To correct substation power factor to...
I have been working for capacitor placemnet in our 12.47 kV distribution system for power factor correction. 3 substations that are feeding from a 115 kV radial transmission line have really power factor. Each substation have kVAR demand around 5000 kVAR. To correct substation power factor to...