Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: GOTEK
  • Content: Threads
  • Order by date
  1. GOTEK

    High Mast Arm Design

    Our Agency has completed very few high mast arm designs, a limiting bearing capacity of 3 ksf is typicaly used, except for those foudations constructed in poor soils I am designing four mast arm foundations using drilled shaft design and FBPIER in combination with LPILE to quantify deformation...
  2. GOTEK

    Preconstruction Surveys

    I'm looking for information on how to conduct a preconstruction survey. There are several "tired" foundations nearby our pile driving operation and I would like to limit our liability by taking some photos, video, and measuring some foundation cracks. We will be monitoring vibrations during...
  3. GOTEK

    Underconsolidated Soils

    I am trying to ascertain how much more settlement I can expect along a stretch of highway adjacent to a lake. I have conducted several consolidation tests, UU, and CU tests. The soils range from med. dense fill material (sands and gravels) to highly organic soil as well as some very loose silts...

Part and Inventory Search