Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: bigd99
  • Content: Threads
  • Order by date
  1. bigd99

    ACI 332 - Discontinuous Footings?

    Our company does alot of "walk out" foundations. The footings are stepped by 4' so that we can pour the foundation as a continuous wall at with wall heights of 12' and 8'. The question is wheter or not the footing needs to be continuous at the elevation change. I know that most people will...
  2. bigd99

    Multi-Level Footings and the Baffled Building Inspector

    I was hoping someone here could point me in the right direction. Our company has built a walkout residential foundation. The site was stripped of native soil and filled with gravel (compacted in lifts). The gravel base was built with two steps with a 4' difference in height. This allows us...

Part and Inventory Search