Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: porf
  • Content: Threads
  • Order by date
  1. porf

    Cable sizing for delta configuration

    This is a hypothetical question and is based on thread238-246755. There it was established that the rating (amperage wise) of a transformer secondary was meant to be interpreted as being 600A in each phase or line. Say for a moment, that this transformer was a delta-wye, 500 kVA, and is...
  2. porf

    Feeder Selection

    In selecting the proper size feeder to a transformer, should I consider the type of load the transformer feeds or should I just go by the primary current required? I am curious if one ever considers that the load may or may not be continuos or non-continous. I have a 3-Ph, 480V-208/277V, 45 kVA...
  3. porf

    13.8kV - 120/240V Trailer Single Phase Service

    I need to power 16 double-wide trailers, each at 120/240V and each double-wide having 2-100A single phase panels. I have a 13.8kV supply. I am thinking of a 3-phase 13.8kV-480/277V dry type Xfmr and then split up phases to feed three single phase 480-120/240V Xfmrs. However, I believe that if...
  4. porf

    I am stumped!

    I am stumped on what seems like a fairly simple calculation using a spreadsheet. I have four vertical user boxes for input of variables. Call them C21, C22, C23 and C24. In C25 I have an equation that uses information from the previous four cells to calculate an answer for C25. Then I have...

Part and Inventory Search