We have a pipeline project where both DIP and CMLCSP were listed as acceptable, we calculated RJ distances using a software but now the DIP is not acceptable anymore. I dont think it would be proper to keep the distances of RJ that were calc. for DIP, on CMLCSP. In your experiences how would...
I have ran across this fitting and am wondering what it is and how do I connect to the pipe coming off the branch of the tee? We are replacing the tee w/ a FLXFL tee and cannot connect to the old piping. Thanks.