<br>Wich should be the equipments refrigeration capacity to install for a cold room once it´s calculated heat load is 3 tons. <p>becerra<br><a href=mailto:ctm@glide.net.in>ctm@glide.net.in</a><br><a href= > </a><br>
I want to know about some termoplastic piping for drainage water at 95°C continuous in the discharge of autoclaves.
If not possible termoplastic piping I want to know other material piping.
I want to know about some termoplastic piping for drainage. Temperature of the liquid for drain 95°C continuous.<br>
email:<A HREF="mailto:ctm@glide.net.in">ctm@glide.net.in</A>