Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: 15121981
  • Content: Threads
  • Order by date
  1. 15121981

    Transformer fire protection

    Hi, We have Oil filled transformer in cable cellar area part of our substation. (Cable cellar: we mean that swithcgear has been kept at First floor level & on ground the cable layed & are terminated in switch gear) Transformer are covered all the three side with 2 hr fire rated wall...
  2. 15121981

    Transformer Fire prtoection

    Hi, We have Oil filled transformer in cable cellar area part of our substation. (Cable cellar: we mean that swithcgear has been kept at First floor level & on ground the cable layed & are terminated in switch gear) Transformer are covered all the three side with 2 hr fire rated wall...

Part and Inventory Search