I've got a project where we're installing 2.5 inch PVC slotted pipe in 4 inches of 90% compacted sand beneath a concrete slab as part of an air sweep system for methane mitigation. One of the reviewers of the system design asked if it would be possible to displace the compacted sand at a given...