  1. boffintech

    shearwall vertical reinforcing vs crossties ?

    I'm inspecting on a job right now, high rise CIP concrete, with lots of shearwalls. One of the shearwall notes reads: CROSS TIES ARE REQUIRED WHERE AREA OF SCHEDULED VERTICAL REINFORCEMENT EXCEEDS 0.01 TIMES THE GROSS CONCRETE AREA OF THE WALL. IF CENTER TO CENTER SPACING OF VERTICAL BARS IS...
  2. boffintech

    concrete placement tolerances at column to slab interface

    ACI-117 doesn't appear to give a straight answer on this. What is the reference for the concrete placement tolerance for top of column to bottom of elevated slab/beam. In other words how far into the bottom of the slab can the column below be over-poured or protrude into the slab above when...
  3. boffintech

    structural drawings / general notes / concrete non-carbonated

    I'm looking at a set of structural drawings that has a general note in the reinforced concrete section which reads: --- Concrete shall be non-carbonated in areas exposed to weather. I've never seen this requirement called out like this so before I ask him what his intent was I wanted to...
  4. boffintech

    footing detail gone wrong ??

    Am inspector on this job that has a number of 8'x'8 isolated column footings with 9#5 T&B EW. In the detail the top mat of column footing rebar is at the same elevation as the rebar in the SOG. The weather proved to be too difficult for the monolithic placement so the bottom half of the...
  5. boffintech

    bond-breaker vs tilt-wall rebar ??

    Am an inspector (not EOR) on some work on a tilt-wall project. I have not asked the EOR about this yet but will if needed. No tilt panels have been poured yet. Thirty to 40 are under construction. The contractor is using Maxi-Tilt as the bond-breaker between SOG and tilt-panels. It says...
  6. boffintech

    welding / pre-qualified joints TC-U4a vs TC-U4b

    Pre-qualified joints TC-U4a vs TC-U4b TC-U4a no root face; has backing bar TC-U4b has root face; no backing bar Question 1: For the TC-U4b, the shop drawings give the root face as 1/8”. The AWS D1.1 as fit-up tolerance reads “not limited”. Not limited? Does this mean the root face can be...
  7. boffintech

    concrete flash set vs "hot spots" during SOG placement ??

    I understand the PCA definition of "flash set". However, I've got a normal weight 4000psi mix (low shrinkage well graded aggregate flex strength of 700psi at 56-days). The last slab-on-grade (7-inch thick and 25,650ft2) placement suffered from a couple of small areas of what appeared to be...
  8. boffintech

    arc spot welds / flat position or not?

    AWS D1.3 section 1.5.4 defines arc spot welds as yada, yada, yada, "in the flat position." Remind me, is that "flat" defined as 0 to 15 degrees and if so where is that shown? No roof with a pitch of 16 degrees or greater can have spot welded sheet steel?
  9. boffintech

    pervious concrete void ratio equation ???

    Have a pervious concrete pavement job and the specs require that the void ratio be determined. Not sure of my formula. What do you think? core length = 5 7/8" core dia. = 3.74 A = wt in air = 2128g B = SSD wt. = 2177.2g C = wt in water = 1250.1g BSG = A/(B-C) = 2.295 job mix formula density =...
  10. boffintech

    verification & inspection requirements -- IBC vs AISC Chapter N

    verification & inspection requirements -- IBC vs AISC Chapter N IBC-2009 Chapter 17 had a schedule of special inspections for steel construction in TABLE 1704.3. This table stated the REQUIRED VERIFICATION AND INSPECTION OF STEEL CONSTRUCTION. IBC-2012 Chapter 17 states in section 1705.2.1...
  11. boffintech

    A490 pre-tension vs sort-of tight, maybe

    Am inspector on a project with spliced joist-girders. Problem #1 = A number of joist-girders were assembled and erected prior to the inspector being notified and, yep, the bolt assemblies were incorrectly marked for pre-tensioning verification by turn-of-nut method and as a result the inspector...
  12. boffintech

    steel / welds / mastic tape / holiday testing ??

    Can anyone give me a heads up on what kind of testing these guys might want? I have limited information right now but from what I understand they using some type of mastic tape to wrap around or over welds. Client mentioned holiday testing. I'm familiar with holiday testing pipe lines coated...
  13. boffintech

    inspection of CJP at moment connection vs prequalified joint

    RE: inspection of CJP at moment connection vs prequalified joint connectegr, I need some of that CWI support for a field welding/bolting issue...question: On a CJP beam to column moment connection, the prequalified joint designation shown is TC-U4a, but have a situation where the column appears...
  14. boffintech

    clarity / bolted connection type / inspection of

    The specification for Structural Joints Using High-Strength Bolts requires that the EOR indicate the connection type. See below. As the special inspector on a project am reading through the drawings, specs., etc. The EOR states in the general notes: “Bolted connections shall be type N...
  15. boffintech

    aci 301-05 vs 301-10

    301-05 states 1.6.3 Testing responsibilities of Contractor 1.6.3.2.d Provide and maintain adequate facilities on the project site for safe storage and initial curing of concrete test specimens as required by ASTM C 31/C 31M for the sole use of the testing agency. Obviously I don't have 301-10...
  16. boffintech

    CMU non-conforming lintel beam / how serious an issue??

    Have a CMU 8" block wall going up. You can see from the picture that the 15' wide opening has 1 precast lintel beam 8" deep. The plan calls for a 48" deep lintel beam with 3 sets of 2#5 horizontal rebars placed bot/mid/top of the beam. 48" of lintel beam was grouted and with all of rebar...
  17. boffintech

    WPS needed for weld-on masonry anchors?

    Is a WPS needed when placing weld-on CMU masonry anchors? If not is there a general standard anywhere for attaching these? I see these things being welded on all the time and talk about your buggered up welds..these things meets none of the requirements of D1.1 Fig. 5.4 and arc strikes from...
  18. boffintech

    boss thwarts efforts

    We own Device-A. Replacement cost = a) $1000 or b) $500+return of core unit If option B is chosen the replacement unit can not be shipped until the core unit is received by the manufacturer. I relay info to boss and advise that we will use option B because we actually have possession of the...
  19. boffintech

    engineer vs code

    I have a couple of inspectors in my office that are notorious for running around saying things like "the code is just a guide" and "the engineer could say to use bubblegum to hold that beam up there and if he puts it in writing then it's OK." What the? Well I contend that we have a code with...
  20. boffintech

    CWI exam / Part B Practical

    Ok, Al a.k.a. gtaw - don't slam me to harshly because I've gotta ask..... I've been hearing/reading about the Part B Practical section of the CWI exam. From what I hear this Part B is similar to running naked through barbed wire; however, what I mostly get for particulars is that it's a bunch...