I would like to set up a percussive arc welding operation and would like to know that the best copper alloy would be for the electrode holders of the parts that would come together to be perc. arc welded.
I have been with a company for 4 years now, Mfg. Eng and design(age 46 yrs,have AS in Mfg. Eng). After the first year it got really boring. Things don't happen too fast in this mature organization. My boss has given me better than average reviews with little complaint. I can do the work in 1/4...
I have noticed a new feature in Solidworks 2008 that makes it necessary to delete a line, dimension, etc. in a sketch twice before it goes away. Is this something a bored SW Engineer came up with to add unecessary work? Does anyone know how to undo this annoyance? I have looked in the most...
Does anyone know how make it faster to assign different dimension tolerances and decimal places while dimensioning a drawing in Acad 2004? I am using dimension-style-overide-tolerances, and making the desired setting, for each type of dim I am making; symmetrical, deviation, etc. Too time consuming!
I would like to make a slab out of silver oxide powder with the silver applied to a mesh. I was thinking of a cold two stage rolling operation using paper on each side as a web. I am thinking I may need a binder mixed with the silver or sprayed onto the grid. Does anyone have any input on this...
After I set up the plotter manager with the paper size I want for a drawing, and plot it, I get a different paper size (Arch D)listed in the paper selection box of the plot dialog box. If I select the one I want again, and then preview the plot, the paper reverts back to this unwanted paper...