Hi everybody,
Cut and cover construction. Excavation is supported by contiguous piles and anchors. I'd like to know whether the active earth pressure acting against the basement wall can be decreased or disregarded in structural design. Thanks in advance.
Hi everybody,
the statement of the problem:
cut and cover metro station (3.5m below the ground level)
top and bottom slabs are 90cm thick, outer shear walls are 70cm thick, inner shear walls are 30cm thick. dimensions are approx. 26m x 23m from axis to axis (1 part of a total station) It has...