Good afternoon from Florence.....
I am a waste water designer. Excuse me for my english.
I have to design a 900 meter pressure sewer.
I have to pass 2 bridge and so i chose pressure sewer.
But the end of the tracing is 3 meter under the start point. i 'm frightened that the pipe become empty...