OEE = Availability x Performance x Quality
This question relates to changeovers/setup of a machine. The machine goes down for a change over/tooling change (40mins), it then starts back-up and runs for 20 mins before reaching good repeatable parts. In this 20 mins of production it is...
Hi
as most calculations are simple its not nesscary to use EXCEL but sometimes they are nice for displaying info.
Has any anyone got EXCEL or software they would share?
I have have written a few and would be happy to share not sure how to do this?
I have simple spread sheets for OEE and some...
Hi has anyone got any reference material on Set Up reduction for a press.
~I am fine with concepts of set up reduction but wondered is any one has any electronic copies of reference material relating to presses, any other areas would be intresting.
I’ve been doing some tests on a set-up at work, vibration is not my area of expertise but I’m keen to develop it so any ideas are welcome.
The set up is a thin plate restraint on all edges, the plate as small holes drill in it (0.2mm dia, by 0.2mm deep [blind holes]). I’m vibrating the plate...
I’ve been doing some tests on a set-up at work, vibration is not my area of expertise but I’m keen to develop it so any ideas are welcome.
The set up is a thin plate restraint on all edges, the plate as small holes drill in it (0.2mm dia, by 0.2mm deep [blind holes]). I’m vibrating the plate...
Hi I’m working on removing bubbles form holes !after some thoughts and ideas,
We manufacture printed circuit boards, we drill hole 0.2mm deep , 0.2mm diameter and are blind (not fully through)
These holes are then treated in electroless copper to make them a conductive passage.
The circuits...
Hi I'm new here and was after some help.
Been a while since I've done any fluid flow.
I have a 3" pipe that falls 6" into a sump for a tank, the connection has various bends. The sump is then pumped up back into the tank.
My problem is I think the pumps are too powerful for the return flow...