  1. mihir5577

    Require Marking On Parts Of Welded Water Column?

    Hi, I want some clarification as per PG-11 - Standard Pressure Parts, That if anybody built welded Water Coulm as per PG-11, and if there was no any markings (Heat #, Matl spec. etc..) on all welded standard parts (Like Caps, Ring- Joint, extenders etc.), than is this acceptable or not? As per...
  2. mihir5577

    Require Marking on parts of welded Water Column?

    Hi, I want some clarification as per PG-11 - Standard Pressure Parts, That if anybody built welded Water Coulm as per PG-11, and if there was no any markings (Heat #, Matl spec. etc..) on all welded standard parts (Like Caps, Ring- Joint, extenders etc.), than is this acceptable or not? As per...
  3. mihir5577

    WELDED WATER COLUMN

    Hi, I need guidence that, Are there any ASME code applies to welded water column, which will going to mount on ASME I (high pressure steam) boiler? What marking/stamping require on welded water column as per ASME I????? Also waht markings require on gauge glass body as per ASME I? I need...
  4. mihir5577

    ASME VIII DIV. 1 - UG-22 CALCULATIONS

    Hi, i need guidence to calculate "lOADING CALCULATIONS" for vertical pressure vessel, which stands on ANSI "L" Angles. Which calculations require as per UG-22? Are there any free software / online calculations available? Pls. guide me ASAP. Thanks Mihir5577
  5. mihir5577

    Allowable steam nozzle loads

    Hi, I want to know, that how to calculate allowable steam nozzle loads for ASME-I boiler? I also want "WRC 107 CHARTS"! FROM WHERE I GET THIS? Is this possible to download? Pls. guide me ASAP. Thanks Mihir55577
  6. mihir5577

    12" dia drum, SA-53 B - UNEVEN OD

    Hi, Pls. i want to know, that, if the 12" & 8" std. wall, SA-53 B PIPE was fell down and od changed to oblong, than is this allowed as per ASME IV? what is allow for UNEVEN OD of pipes as per ASME IV???? Pls. reply me ASAP. Thanks MIhir5577
  7. mihir5577

    ASME SA_53 B vs. ASTM A53 B

    Hi, Any one can guide me that, can we use ASTM A-53 B material instead of ASME SA-53 B material in hot water boiler ASME-IV? where all our registered dwgs. are according to SA-53 B! If yes, do we have to do any documentation? Pls. guide me ASAP. Thanks Mihir5577
  8. mihir5577

    ASME SEC I

    hi, Is ASME sec I allow patching at bigger hole to make it smaller as per diameter of down comer od?I.e We made offset hole on drum and now we have to move down comer appx. 1", so can we patch that 1" offset howl with the same matl. and thkness of pipe? Also can we do PWHT again on the area...
  9. mihir5577

    ASME I, HYDRO TEST

    Hi, I just want to know that, Is ASME sec I, allows leak during hydrotest of boiler with power piping from mechaincal joint (Threaded connection)? If yes, Which para of ASME I and not Then also which para of ASME I. Thanks Mihir5577
  10. mihir5577

    STEAM NOZZLE LOAD CALCULATION

    Hi, Is any one tell me that how to calculate steam outlet nozzle load calculation in X,Y, & Z direction? Pls. help me ASAP. Thanks in advance. Mihir5577
  11. mihir5577

    ASME SECTION I SPOOL PIECE

    HI, ANYBODY EXPLAIN ME THAT HOW TO MAKE 5"DIA X 8"DIA X 50"LG. SPOOL PIECE FOR STEAM OUTLET? I WANT TO MOUNT 5" CHECK VALVE AND 8" STOP VALVE ON OUR BOILER'S STEAM OUTLET 8" FLANGE. CUSTOMER WANT THIS WAY ONLY!!!!!!!!!! PLS. HELP ME ASAP..... THANKS MIHIR5577
  12. mihir5577

    ASME vs EUROPIAN STANDARD (PED )- CE???

    Hi, I want to know ASAP that, is there any way to getting pass the shipped water boiler built under ASME SEC IV, in any European country, which requires boilers under only European standards- PED (CE)? Is there any way to getting pass under European code, which built under ASME-IV, by providing...
  13. mihir5577

    ASME SECTION I-RELIEF VALVE mounting

    HI What are the requirements for the connecting piping of the two (2) relief valves to one boiler pressure vessel opening (Cplg.) for relief valve? Is there any calculation required to show an A.I? Pls. advise asap. Thanks M.B.S
  14. mihir5577

    ASME SEC I, SAFETY RELIEF VALVE

    HI, I WANT TO KNOW THAT, CAN WE USE TWO SAFETY RELIEF VALVE FROM ONE CONNECTION ON TOP DRUM BY USING TEE OR ANY OTHER FITTINGS, FOR HIGH STEAM BOILER[ABOVE 500 SQ. FT HTG. SURFACE AND ABOVE 4000LB/HR STEAM GEN. CAP.]? IF YES I WANT TO KNOW PARA NO. FROM ASME SECTION I. I WANT RESPONSE VERY VERY...
  15. mihir5577

    ASME-CSD-1

    HI, I WANT TO KNOW THAT AS PER ASME CSD-1, WHAT IS THE MIN. PIPING SIZE REQUIRE FOR PRESSURETROL, PRESSURE GAUGE CONNECTED TO TOP DRUM OF HIGH STEAM BOILER-150 PSIG? PLS. REPLY ME ASAP.... THANKS MIHIR5577
  16. mihir5577

    ASME SECTION I - PWHT (SR)

    HI, I WANT TO KNOW THAT, IS THERE PWHT (SR) REQUIRE FOR 3" WELD NECK FLANGE WELDED ON 8" STD.SA-53B PIPE (DOWN COMER OF BOILER)? I NEED HELP ASAP.... MIHIR5577
  17. mihir5577

    ALLOWABLE MAX.REINFORCEMET

    Hi, I want to know that how much reinforcement allow for drum to falthead welding by submerged arc welding? Is it different for ASME SecI & Sec IV? Pls. let me know Mihir5577
  18. mihir5577

    Reinforcement

    Hi, I want to know that how much reinforcement allow for drum to falthead welding by submerged arc welding? Is it different for ASME SecI & Sec IV? Pls. let me know Mihir5577
  19. mihir5577

    Authorised Inspector Examination

    Hi, I want to know that from where will i get materials for preparation of national board examination? If anybody have it, i am ready to pay for copies send to me at my address. require your help. thanks M.B.S
  20. mihir5577

    ASME SECTION IX-WELDER QUALIFICATION

    Hi, I want to know that, in ASME section IX anywhere mentioned that Authorised inspector require during qualify the welder? Also if A.I reject welder's coupan, what we can do? pls. help me asap Thanks M.B.S