Hello all,
I've just started to work on stress analysis.
I have to add 2 valves 12"-150# to an existing line (12" fluid:hydrocarbons)and calculate with B31.3 lines.
Now, I have 2 problems:
1) This line is very long and has a lot of ramifications and the anchors are very far from interest zone...