We are constructing an AC Pavement sport court (2" AC with 4" base rock). The subgrade soil is stiff, thick adobe clay. The spec calls for scarifying 8 inches of the subgrade, and conditioning to a moisture content that will allow for compaction to the specified (90% MDD).
Based...