Due to recently increased production rates at the cogen plant that i work at, we have been sending low superheated steam to one of our Turbine generators. The design parameters for the inlet steam to this GE turbine are 540PSIG at 750F. Steam as low as 680F is regularly sent now to the T.G. and...
Due to recently increased production rates at the cogen plant where i work, we have started to send low superheated steam to one of our GE turbine generators. The design parameters for the inlet steam to this turbine are 540 PSIG at 750F. We have send steam as low as 680F and i wanted to know if...
Due to increased production rates at our cogen plant, we have been sending alot of low superheated steam to one of our turbine generators. The design parameters for the inlet steam to this GE turbine are 540 PSIG at 750F. We have been sending steam as low as 680F recently and I wanted to know...