Situation:
3 pieces of central heating gas-boilers with 1000 kW with 3 circulation pumps of each 51 m³/h, connected with a hydaulic switch to a pumping circuit with 2 heat exchangers.
The piping has visible vibrations in special operatation conditions but the operating points of this are not...