Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: HYDL
  • Content: Threads
  • Order by date
  1. HYDL

    3-pole ATS and breaker trip during transfer

    We recently installed a new Asco closed transition ATS to feed a new data center at a hospital. To test the system, the electrician shut off the utility breaker feeding the transfer switch and the generator started up and the ATS transferred to emergency power. After the test was over, the...
  2. HYDL

    Mysterious Voltage Potential

    We have a project at Yellowstone National Park and the contactor is experiencing a voltage potential issue. It started with a 5 volt potential between metal steps, in contact with the ground and the various job trailers. They turned the power off at the meter pedestal, which disconnected all the...
  3. HYDL

    Equipment Ground currents

    Is there a standard that dictates how much equipment ground current is too much? Certainly, the ideal is zero, but what would be considered an acceptable level?
  4. HYDL

    Grounding Electrode sizing

    I am looking for information on how the NEC 250.66 table was derived for sizing the grounding electrode.
  5. HYDL

    Motor Whining

    I am trying to learn what I can about Motor Whining. We have a cooling tower motor at our building that has a significant Whine. It is served by a VFD and I'm thinking that this may be the reason. Anyone have any input in this regard?
  6. HYDL

    Bussman Point by Point AIC Calcs

    I've been evaluating the Point by Point method of AIC calcs that is in the Bussman Fuse book and also indicate in other literature. They have calculation for an f factor and an M factor. I'm trying to figure out where they come up with the M factor (the multiplying factor) 1/1+f.
  7. HYDL

    Wye Wye vs Delta Wye Transformers

    I 3 paralled Generators to power an Industrial System Wye System. This is a prime power application. The Generators will serve a Transformer that is 480v - 4160v Wye. The plant is mostly motor loads and will likely have some harmonics due to VFDs. I'm wondering if I should go with a Delta at...
  8. HYDL

    Evaluating Harmonics

    I've been monitoring Harmonics at a 911 call center. They have two 12.5 KVA, 1-phase UPS at 240 volt. The 208 volt system has a boost transformer for each for the 240 volt. I've review the IEEE 519-1992 document. 3.5% is the highest THD that I've measure at the line side of the system. So...
  9. HYDL

    Ground Currents in Parallel Feeder Equipment Grounds

    I have an 800 amp feeder between the building main where the ground and neutral are bonded. There are 3 parallel 350 Kcmil and 3/O equipment ground per EMT conduit. With the equipment grounds connected at both ends, does this result in some circulating currents due to induced current in each...

Part and Inventory Search