Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: bjm1
  • Content: Threads
  • Order by date
  1. bjm1

    hec-ras program

    How do you define your last x-section so tht the program interprets the right and left bank properly. Every thing I have tried switches my right bank to left unless I put a false x-section 5 feet down stream. any sujestions?
  2. bjm1

    Curing Concrete -slab on grade

    Is it possible to keep a concrete slab on grade (floor 4" thick) too wet after placing it? The slab was kept moist sprinkler or wetted with a hose for 3 1/2 to 4 weeks after placememt. The slab was inside a closed building and plastic was placed over the slap untill the color was uniform after...

Part and Inventory Search