How do you define your last x-section so tht the program interprets the right and left bank properly. Every thing I have tried switches my right bank to left unless I put a false x-section 5 feet down stream. any sujestions?
Is it possible to keep a concrete slab on grade (floor 4" thick) too wet after placing it? The slab was kept moist sprinkler or wetted with a hose for 3 1/2 to 4 weeks after placememt. The slab was inside a closed building and plastic was placed over the slap untill the color was uniform after...