I just added a new 120/208 volt standby generator to an existing system. To accommodate the addition, I added a new service entrance breaker which feeds the ATS which feeds the old service entrance equipment. The contractor was to install a new grounding electrode system connected at the new...
I have a 3000A grounded wye service with main breaker, GFP and 3 pole ATS. The generator neutral and ground are not bonded together and are tied to the respective buses of the swithcboard. Is this a code violation?