Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. sTrucTureTec

    Ribbed concrete roof slab w/CMU infill?

    I am investigating a roof design that I have not previously seen. The roof consists of a 2.5 in. slab cast with 6"x12" RC beams spaced at 21". Between the beams are 12"x8"x16" hollow core CMU blocks. I assume the CMU was cast with the concrete and are anchored in some fashion. My question is...
  2. sTrucTureTec

    Structural Spreadsheet software

    We are still an infant company and can't afford to run out and buy some of the great and expensive available software for a small project. We have a project requiring verification of several existing concrete t-beam load capacities for a structure built in the mid-sixty. Are there any free...
  3. sTrucTureTec

    Priviate industry bidding exchange

    I'm a startup company and looking for leads to finding projects I can bid on that aren't government projects. Are there any websites out there that offer the ability to review and submit bids on projects you are interested in? Thanks, Kelly Lyons, PE Principal www.sTrucTure-Tec.com
  4. sTrucTureTec

    WWR designations & charts

    Does anyone know where I can find a good online resource for explaining welded wire reinforcing designations and spec information? I have a small SOG, but I don't want to use rolled WWR for obvious QC reasons. Thanx in advance. Kelly Lyons, PE Principal www.sTrucTure-Tec.com
  5. sTrucTureTec

    AutoCAD title block logo

    I have created a title block with a graphic (.tga) logo. It prints out with a box line around it. I can't find a way to eliminate box. Does any one have a suggestion. Thanks. Kelly Lyons, PE Principal www.sTrucTure-Tec.com
  6. sTrucTureTec

    Startup curve?

    Greetings, I am new to this forum. I started my own project management and structural design firm last October. My question is how long should I expect to go workless before activity and results of my marketing are realised. I have been doing all, direct mail and email marketing, website...

Part and Inventory Search