thread124-376699
System: Crude Tank Vapor Recovery Unit Compressor/HC Condensate Pump Discharge
Coalescer in downstream of Condensate Pump discharge - for moisture/water removal before export to 35 km long pipeline with destination to a Gas Processing Plant
Pump: 1000 psi discharge Pressure...
Existing Oil & Gas industry Produced Water Tank with Fuel Gas blanketing need to be provided with seal protection in the overflow lines. Sketch of the overflow lines is given in the attached worksheet. Kindly advice on the type of seal recommended for overflow lines...
Produced water overflow pipeline from many Tanks is routed to an Overflow Header which finally ends up in an Open Pit (for use during emergencies)in a existing Produced Water Handling Unit. Overflow pipeline from Tanks joins the header from below ground as shown in the attached simple sketch...
Preliminary design of Gas Gathering (100 mmsfd of high H2S (upto 10%) associated natural gas) includes piggable pipelines from different gas sources (50 psi) and joining Slug Cather followed by Gas Compressor (25 psi-suction pressure). But now pressure at gas sources are proposed to get lower at...