Can some one tell me what is the going rate for 3000 psi concrete per cubic yard in North East (Western New York) for cold weather concreting (may need upto 150 cu. yard)? With type iii cement (w/c ratio 0.50 - 0.55, mixed with heated water, 5 - 7% Air content, and super plasticizer)...
I have a reinforced concrete basement wall for a new home poured by a contractor at Amherst, NY on December 14th. The high and low temperatures on that day were 32 and 20 degree. The high & low tempreatures on the next day were 40 and 24. The top half of the wall was covered by insulated...
I have a reinforced concrete basement wall for a new home poured by a contractor at Amherst, NY on December 14th. The high and low temperatures on that day were 32 and 20 degree. The high & low tempreatures on the next day were 40 and 24. The water-cement ratio of concrete was 0.54 and type III...
I have a reinforced (#5 @24c/c vert. & hor. on each face) concrete basement wall for a new home poured by a contractor at Amherst, NY on December 14th. The high and low temperatures on that day were 32 and 20 degree. The high & low tempreatures on the next day were 40 and 24. The water-cement...