A friend told me to read up about Line 35 on the 1040 form.
"You may be able to deduct up to 3% of your qalified production activities income from the following activities..
2.) Engineering or architectural services performed in the U.S. for construction projects in the U.S."
You are...
I finished my undergraduate degree in civil engineering and have worked for about 2.5 years as a geotech/structural engineer. Similar to other posts, I'm thinking about going back to school.
My career goal is to continue to work on new projects because they are fun and I like to learn. I...
Has anyone heard of a "Rill" System for Stormwater Management before? I'm looking for information regarding the design of this system.
I recently inspected a storm water system for a subdivision that our client called a Rill System. My understanding after the inspection is the Rill System...
As recently discussed in the Sheet Piles Retaining Wall LRFD Thread, the DOTs will require the use of LRFD design by 2007 for geotechnical structures. I have not yet designed anything using the LRFD criteria. I have heard that the LRFD method will give a more conservative design when designing...
I work for a geotechnical consulting firm. We do settlement analysis frequently. I have been looking for a good settlement program but have not found one that I am currently satisfied with.
Do you know of a good program that can handle the following cases?
1) Consolidation, where ground...