Hello all:
I am putting a new 4160V diesel genset in service on an existing med voltage transfer switch. To verify phase rotation I have a 25kV meter with two probes. I plan on reading utility A to gen A and so on with B and C, watching them go to zero volts as they drift in and out. If all...
I have three gensets recently installed at a facility with mainly UPS and other electronic loads. They are identical 2000kW sets paralleled to a common emergency bus. The utility transformer feeding the facility is rated at 7500kVA. When the bldg load is powered by the utility transformer there...