I need to cover the following items in a commissioning procedure and could use some help as to EASILY located reference (either online or Library). The project is an onshore and offshore pipeline/pumping station. Onshore is impressed current and offshore is galvanic anodes. In the list below...
Wanted to find out the difference between switchgear and MCC. Drawing uses the term switchgear, but in manuals the same switchgear is referred to as a MCC. Is that just because it is switchgear that contains motor control circuits? Thanks!