Hello-
I have to go through 16 miles of cross sections, 50 feet at a time to determine if the slopes meet certain conditions. Basically, I need to know which sidehill fills are steeper than 8H:1V. I am using Geopak Road, V8 and I know there has to be a faster way than drawing a line...