  1. Bekza

    Determination of Undervoltage Settings (MV Motor Protection)

    Dear all, Manufactures of MV motors recommend 70% to 85% of Un (norminal voltage) for undervoltage protection.What factors were considered when determining the undervoltage protection setting and is there any calculation that can be done from first principles to determine such setting value...
  2. Bekza

    Effects and Impact of Cyclic operation on 700MW Generators

    Hi all, Our power plant was initially designed for base load operation but due to some reason we were then required to change operating regime to two shifting (cyclic operation). This meant increased barring hours, increased number of stop starts which had bad impact to our rotors and all rotor...
  3. Bekza

    Turbo Generator Water Chemistry

    Hi A question below: 1. what are the advantages of operating stator water chemisty at low oxyen elevated PH. I recently experienced high copper from the water, oxygen, ph, conductivity levels all ok. iron slightly out. 2. what is the safest dew point when operating h2-water cooled machine? is...
  4. Bekza

    700MW Rotor End Bells Damage

    Hi all, I have a question regading 700MW generator rotor. 1. What kind of damage will the generator experience during switch on to stand still (SOS). I have seen pictures of rotor which suffered SOS but not sure exactly what else could go wrong? 2. If say 3000 rpm rotor is turning at lower...
  5. Bekza

    Gen rotor monitoring technique

    Hi all, I have had a quite number of incidents were the rotor pole A to pole B connector flexible were found cracking progressively due to stop-start operation. I have reaseached quite number of on-line tests and off-line test that can detect this problem. Thus far the stray flux test is the...
  6. Bekza

    Generator MVar Capability Testing

    Hi What is the impact of conducting MVAr capability test on the generator to prove the the ability of MVAr expoting to the system against the OEM supplied capability diagram. I will push the machine to the rated MVar and keep it constant for about three hours during that time verything must be...
  7. Bekza

    Generator Rotor Barring Hrs

    Hi Can someone please explain what effect will barring have on the rotor of 600 to 800 MW machine, will increasing or reducing the barring speed reduce the probability of fretting on the rotor slots etc?. With a two shifting station alot of our machines sees a lot of stop-start mode of...
  8. Bekza

    Turbo Generators

    Hi, Please questions below: 1. I am responsible for the performance, maintanace and condition monitoring of six 600 to 700MW generators.I have since observed that at higher MW and MVar the stator core temps are increasing proportionally but some other sections on the core, particularly the end...