  1. r2s7c8

    Crude temperature at desalter inlet

    I am working on a concept study for an oil & gas onshore field would like to know the following: - What is the allowable temperature at Desalter Inlet. I undestand that the crude is preheated between 65 to 70°c before entering the desalter. - Is there any guideline between the Viscocity of the...
  2. r2s7c8

    Crude temperature at desalter inlet

    I am working on a concept study for an oil & gas onshore field would like to know the following: - What is the allowable temperature at Desalter Inlet. I undestand that the crude is preheated between 65 to 70°c before entering the desalter. - Is there any guideline between the Viscocity of the...
  3. r2s7c8

    Fluid Charectorization

    I have come across the phrase "Fluid Charectorization" while going through a concept study report for an oil and gas facility. Kindly let me know the following: - What is Fluid Charectorization ? - What is C7+ Charectorization? - Significance of Fluid Charectorization ? Thanks.
  4. r2s7c8

    PVT Analysis

    I am working on a concept study for an oil & gas onshore field and have got PVT analysis for a number of wells. I would like to know the following: - which composition should I consider since there are different composition presented in the report (bottomhole sample, recombination etc.) - what...
  5. r2s7c8

    Three Phase Separator Performance

    While specifying the performance requirement for a three phase separator in an oil and gas central processing facility kindly let me know the following: - typical oil in water and water in oil carryover. - liquid carryover in gas outlet. I would like to know if there are any guidelines to be...
  6. r2s7c8

    Slug Volume Calculation Using Hysys

    I have tried to use the "Do Slug Tool Calculations" option in Hysys (pipe segment) to evaluate the pipeline slugging. The Slug Tool Results table displays the following results: Position, Status, Frequency , Slug Length, Bubble Length, Film Holdup, Velocity, Pressure Gradient and Length Ratio...