  1. ppaya

    SATURATION OF ct TESTED FROM REMOTE RELAY ROOM?

    I was asked to test CT's in new substation from breakers itself (OK with me) and from relay room(this is part I don't quite understand why)??? I am not sure if there is such a practice since I haven't seen one in my 10 years of field service. Any thoughts guys?
  2. ppaya

    winding configuration of generator step-up transformer

    what winding configuration of generator step-up transformer is most used in North America when generator is connected to LDC feeder? delta on HV side or delta on LV side?
  3. ppaya

    Joslyn breaker

    12kV cable feeds furnace transformer (delta primary) via load break switch and Joslyn vacuum bottle breaker. We just had another failure of the vacuum bottle. Operator thought all three phases were open (one was not due to failed bottle) and when he closed breaker there was big explosion. One...
  4. ppaya

    Mathematical Vs Power Engineering convention (Power Factor)

    I see that some of us are more familiar to mathematical convention. Therefore motor load is described as "consuming WATTS" and "Generating VARs (or consuming negative VARs)". This means power factor is negative and lagging. Engineers would conviniently say motor load consume both. Power factor...
  5. ppaya

    Zig-zag transformer winding

    Hi all: I need little more info on zig-zag config on Tx winding. I understand it is not uncommon in North America as a secondary winding conn. I need to now why? My understanding is that it limits SC but how? Is it due to more inductance in winding? What is engineering justification for this...