My client is planning to utilize the existing distribution system to convey the newly treated water with pH level of 6 to 7. Since the water is treted with RO and pH adjustment, its mineral content, including calcium, is very low. The distribution system is made up of cement-lined iron pipes...
PLEASE HELP IN OBTAINING MANUAL ON HOW TO START-UP, COMMISSION AND MONITOR A CHLORAMINATION TREATMENT PLANT.
THIS IS THE FIRST TIME WE HAD IT IN OUR REGION. WE HAVE PURCHASED THE EQUIPMENT AND ABOUT TO INSTALL IT. IF SOMEBODY OUT THERE WHO HAD COMMISSIONED BEFORE A CHLORAMINATION PLANT PLEASE...
I need a basic understanding of how easy or difficult it might be to treat some high chloride acidic wastewater.
We are regenerating water treatment resins using hydrochloric acid and the resulting 4-5 cu. m per day of wastewater has a chloride content of 7,000 - 8,000 mg/L.
The limit for...
I had a five years experience as a Process Design Engineer but everytime I join a project it was already started & the Process Flow Diagram has been finalized. My problem is if I start to create a chemical process plant from scratch, how should I start?