Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: kruzie
  • Content: Threads
  • Order by date
  1. kruzie

    Support for house addition

    I am building an addition on to my house with concrete piles for support. Can anyone tell me what the maximum spacing is for a 2" x 10" floor joist
  2. kruzie

    wet dirt

    I a doing the site grading on a steam injection heavy oil plant in Alberta,Canada. The site has recieved alot of rain and has saturated the ground. What would be the quickest way to dry out the site.

Part and Inventory Search