I fess up that I am not an engineer. I own a channel lot. 70' of channel frontage. Steel sheetpile wall, clay soil, 24" by 12" sheetpile deadmen every 10 feet 18' back from wall. Two 3/4" tie rods from sheetpile wall welded to each deadman, unfortunately not threaded and bolted...