1.) Do you include wind & seismic loadings in the checking/qualifying of a nozzle when maximum allowable nozzle loads are provided?
2.) Understanding that when performing WRC107 wind and seismic are included. Is there a 1.33 factor applied in this situation?
3.) What is maximum allowable...
I am looking for the standard or code that governs what temperatures and times are required for different hydrogen services for bake-out of piping.
I am attempting to create a procedure based on the different hydrogen (partial-pressure %) systems and need some input on where to locate the...