Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: mrelectric
  • Content: Threads
  • Order by date
  1. mrelectric

    Cable Tray outdoor

    I need you help. I am designing a system where I want to use a cable tray outdoor. I would like to drop my cable ( 2500A ) on top of an outdoor bussed section. Do you know any vendor of watertight seal I can use to drop my cables to an outdoor switchboard? I have been asking assistance from...
  2. mrelectric

    NEC 517.30 (B)(4)

    I am new to the forum but I have learned quite a lot by just reading through different threads. I need your input on the intent of 517.30(B)(4) on this scenario. If I have an essential load consisting of 50KVA Life Safety branch, 100KVA critical circuit branch, and 150KVA non delay equipment...
  3. mrelectric

    Assymetric Current - PEAK & RMS

    Can anyone pls tell me how the following formula for assymetric current (rms) and (peak)from a power system manual has been obtained. I asym (RMS) = I"k * sqroot (1+2e^[-4(3.14)(R/X)C] I asym (peak) = I"k * sqroot(2) * (1+e^[-2(3.14)(R/X)C] where C = cycle I"k - initial symmetrical fault...

Part and Inventory Search