What are most people seeing the contractor do when this type floor is specified ?
How close do you need the chairs to hold mesh this light of mesh in place. 12" ? Does anyone allow the contractor to walk in mesh or pull up mesh ? How can the contractor get the chairs in place in an enclosed...
Over the years I have worked on a number of houses that were constructed on top of crushed concrete. In some cases they have continuing problem with build up of calcium in the sump pump and pipes. We have measured the ph in the water in these sumps and found it to be about 8.5 to 9. Normal in...