Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: KWG53
  • Content: Threads
  • Order by date
  1. KWG53

    Vessel Repair with no U1 form

    I've been asked to build a new shell section for a "BEM" type exchanger & reuse the existing channels. Problem is he has no U1 data report form....is this legal ? Can I build this as the original or is it deemed new conctruction ? Thanks
  2. KWG53

    SA 516 Gr 70 HIC Plate

    Can someone tell me at what level of H2S do we have to use HIC plate. I have an exchanger with a stream containing 100ppm H2S 140F to 200F @ 60psia. Is there a table or chart that will tell me this ? Thanks KWG
  3. KWG53

    Low Temp Impact Testing

    I have to build a liquid nitrogen exchanger -350F design. I'm using SA240-304. Question : looking at (Div 1) UHA-51(g) does this exempt you from all impact testing or just base material ?

Part and Inventory Search