Hello,
I trying to determine the maximum length that thermocouple (extension) wire can be run from the connection head directly to a PLC T/C board. Is there a standard (API, ISA, IEEE, etc.) which addresses this installation question?
Best,
KC
Hello,
I have typically seen installations for orifice plates with the flange taps located on the side of the orifice flanges (in a horizontally run line). Is it acceptable to have the taps located on the top on the flanges? If so, would condensate pots need to be added to the impulse lines...