Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: roadspecialist
  • Content: Threads
  • Order by date
  1. roadspecialist

    rehabilitation of ogie type dam

    the existing overflow type dam for an irrigation project spans 30m across the waterway with a height of 6m. built without an apron slab on the downstream side, the dam is undermined and is hanging supported only by the abutments on both banks. any suggestions on how to rehabilitate. will...
  2. roadspecialist

    stabilizing slide prone section over silty clay sub grade

    grayish silty clay subgrade was exposed during roadway excavation.a three meter embankment fill placed directly on the clay subgrade slipped over the steep side slope after heavy rain.saturation of the subgrade affected by the spring located on right side upper slope.any suggestion on how to...

Part and Inventory Search