We have a new job - to build and commission a NGL Pipeline.
Never done this before. Crude Oil, yes. Gas, Yes.
IN order to stop teh NGL evaporating on injection into the line I guess we have to pre-pressure it.
Anybody commissioned a NGL Pipeline? Tips, hazards etc?
Replies appreciated.
Does anyone know how to calculate (simply) the dew point of a natural gas mixture given its composition?
There was a very informative thread798-142881 now closed about cricondentherm etc.
I seem to have a basic misunderstanding which is:
Our client states a cricondentherm temp of 4-10degC for...
I have typically added corrosion inhibitor and Oxygen scavenger to pipeline hydrotest water.
I now have a specification which does not require it. Only potable water. If I were to add chemicals I will incur high costs of disposal as the water will then be classified as hazardous.
Am I safe to...
Could anyone supply a step by step start-up procedure for oil fired boilers (produciing staem for power generation)?
I am especially interested in the sequence involving "Boil-out and Chemical clean". Does this take place after initial start-up using generated heat or is temporary...