  1. smead155

    220,000 yards of fill

    Does anyone know how long it would take a grading contractor to move and compact 220,000 cy's of fill. All the fill is coming from the same site and will not have to be moved more than 1,000ft (this would be the longest haul.)
  2. smead155

    stripping before filling

    When is the best time to strip topsoil(organic matter) before filling and compacting in cold weather.
  3. smead155

    blasted rock Fill

    Where is the best place to use blasted rock for fill in a residential subdivision. Streets, back yards etc.