I wonder if someone out there could help or point me in the right direction.
Where can I find installation times (unload, set, align, piping, electrical, testing, start-up etc.) for steam (750 psig) turbine/generator units in the 2MW to 5MW range.
I have a standard man-hour labor rate book...