Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: Zehnder
  • Content: Threads
  • Order by date
  1. Zehnder

    engineering/construction company in riga/latvia

    we are going to build a new power station in riga/latvia and are looking for a local supplier of basic engineering of water/steam piping, vessels, pumps etc. the supplier shall be able to provide both engineering and hardware supply including turnkey erection. any ideas if there are some...
  2. Zehnder

    make up to steam cycle

    what are the advantages/disadvantages of adding the make up water into the feedwater storage tank deaerator versus adding it into the condenser? our dearator tank pressure will always be above ambient pressure. the condenser of the backpressure turbine will be operating in vacuum and also above...
  3. Zehnder

    sizing of steam drain lines

    i am trying to dimension the drain lines of a power station steam piping system. what are the dimensioning criteria? i would assume it is the condensation of saturated steam admitted to the cold piping during startup. are there any thumb rules to design the drain system properly to ensure proper...

Part and Inventory Search