Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: Rookie2
  • Content: Threads
  • Order by date
  1. Rookie2

    Modeling Diversion in HEC-HMS

    Hi, I'm trying to model a water quality / detention pond in HEC-HMS that has two outflow structures draining in different directions. One outlet (riser) drains to a second pond, the other (concrete spillway) discharges to a channel. I was hoping for some advice on how to split the flow in the...
  2. Rookie2

    HY-8 and Windows 7

    Hi, I was just wondering if anyone is using FHWA HY-8 7.2 on a Windows 7 (32 bit) computer. I recently installed Windows 7 and I'm trying to finish a project that I started using HY-8. It seems to work fine until I try to define an irregular roadway section. It gives an error that says "MFC...
  3. Rookie2

    Detention Question

    I am modeling a detention pond. The detention is provided by building a dam on a stream. A large diameter culvert is proposed in the stream bed. This was permitted by the USACE. Two of the conditions of the permit were: 1. The detention time must be less than 2 hours 2. The pipe must be...
  4. Rookie2

    Fire flow test at single hydrant

    Hi, I am working on a residential subdivision where we are tying into an existing waterline that looks something like this- exhyd1 exhyd2 exhyd3 0----------------0---------------0 Our site is adjacent to existing hydrant 2. In order to perform our fire flow calculations...
  5. Rookie2

    WaterCad question

    Hi, I am modeling a proposed residential subdivision for adequate fire flow. I have done this several times before, but the available flow and pressures at the connection to the existing system were based on hydrant flow tests. I then used that data to model the connection as a reservoir and...
  6. Rookie2

    Hydraflow Storm Sewers / HGL Question

    Hi, We are designing a storm drain system for a subdivision which ties directly into a system downstream that is currently under construction. The downstream system was designed by others and was supposed to be designed to carry our flow. The engineer of the development downstream was kind...
  7. Rookie2

    Hydrant Flow Test

    Hi, We are designing a distribution system for a subdivision. We have had two hydrant flow tests done at this point and can't provide calculations that show that there is sufficient pressure for fire flow. There are 3 pump stations that pressurize the system we are tying in to. There was only 1...
  8. Rookie2

    Pipe Surcharge

    Hi, We recently recieved a review comment requesting that we install watertight joints on a RCP storm drain line due to the fact that the HGL showed that the pipe was surcharged. This particular line is the most upstream segment in the system and the surcharge is due to inlet control. My...
  9. Rookie2

    Land Desktop; 3d polylines

    Hi, Is there a command that will automatically assign vertex elevations to a 3d polyline by reading them from a surface? I am thinking I either read about a way to do this or ran across the command at some point in the past; or is this just wishful thinking? Thanks in advance
  10. Rookie2

    Strippings Depth (Waste Soils)

    Hi, I was hoping for some advice concerning a project that I am working on that is currently under construction. I realize that earthwork calculations are somewhat of a best guess, and that strippings depths vary greatly from site to site / region to region. The problem that I am having on...
  11. Rookie2

    Sheet Sets

    I was looking for some opinions on the sheet set tool. Does anyone use this? If so what in you opinions are the pros / cons. I have read a little about it, however I never seem to get the time to read and experiment with it enough to understand it fully. Is it worth taking the time to do this...
  12. Rookie2

    Wetlands Delineation

    Hi, We have inherited a project on which a wetlands delineation was performed by a certified wetlands scientist. As far as we know the delineation was never verified by the USACE. Is this a requirement if we are not disturbing wetlands and disturbing less than 150' of stream? Also could...
  13. Rookie2

    Roof Drainage

    Hi, I was hoping someone could recommend a good economical way to pipe runoff from roof drain downspouts and tie to a storm drain system. Our particular project is a daycare with parking in front and a playground on the other 3 sides. There are roughly 3 to 4 downspouts per side. How is this...
  14. Rookie2

    Maximum Dry Density

    I am working on a residential subdivision in which the municipality requires 100% compaction of the aggregate base course under the curb and gutter. The contractor on this project constructed the curb and gutter about 8 months ago prior to having any compaction tests done. The municipality...
  15. Rookie2

    Time of Concentration / Peak Runoff

    I'm confused, please help. Why is it that as time of concentration for a watershed goes up, peak flow goes down? And does it make sense to split a relatively small watershed(<100ac)into subwatersheds with different time of concentrations and combine hydrographs? Does this assume that a storm...
  16. Rookie2

    Time of Concentration / Peak Runoff

    I'm confused please help. Why is it that if you use a higher time of concentraion for a watershed, peak flow goes down? TIA

Part and Inventory Search