Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: btg
  • Content: Threads
  • Order by date
  1. btg

    Heat Tracing Sulfuric Acid Pipe

    I've got to run approximately 400' of above ground pipe from a 98% sulfuric acid tank to our acid header. I live in South Louisiana and our lowest monthly average temp is between 40-45 degrees F. The minimum flowrate of acid would be 1 gpm. I'm wondering the need to heat trace the piping. Is...

Part and Inventory Search