    CO Plant

    We have an application for a 50%CO/50%H2 gas compressor. Are there any 'funnies' I need to watch out for? Are flanged joints OK or does the high CO toxicness require welded pipe? Is carbon steel OK or would you need stainless or better? I know the hazardous area will be gas group 11C for the...
  2. mb44

    Pipe Size for Thermowell

    why in natural gas sytems (say 98% methane 30 barg 5000 kg/h 50C) does there seem to be an engieering standard for 4inch line size for thermowells, thermowells with RTD or T/C conected back to a transmitter only measure at the tip so why cant the line size be 2 or 3inch?
  3. mb44

    Compressor Noise

    I'm a process engineer looking for some 'simple' guidance We have a compresor package, electric motor driven less than 350 kW for natural gas I understand there is an EU directive on sound power and pressure noise limits, but how do we meet these requirments, we can't test the package till we...
  4. mb44

    fire water pump

    does anyone know a UK or european company that does fire water pump skids, not just the pumps the full skid, diesel pump and electric pumps and jockey pumps Its for an onshore gas plant appreciate any contact names, only lloking for budgetary information at this stage
  5. mb44

    heat loss in buried pipes

    Can anyone tell how you calculate heat loss from buried carbon steel pipe, natural gas in pipe?