I am extending the purified water loop on a site.
My plan is to fabricate up the various spools in-situ and tie them into the loop at a later date.
My question is this.
Is it acceptable to fabricate these spools now and leave them sit for a couple of months without passivation.
What are the...
We operate a 4 lamp UV disinfection unit on our purified water distribution loop.
During a 3rd party audit we were requested to calibrate the UV intensity meter and duty hour totaliser on the unit.
I have a number of questions regarding this:
1) Does anybody currently calibrate their duty hour...
Hello All,
Quick question.
Does anyone know if there are specific P&ID symbols for Zero Dead Leg valves or does the normal diaphragm valve symbol suffice?
Regards
Daragh
I have an interesting problem with regards feeding 2 purified water storage tanks with one generation system.
I'm trying to design a method of delivering purified water from the product line of an EDI to 2 separate storage tanks and back to an RO Break tank. Each storage tank will have its own...
I am hoping to install an Alfa Laval double walled plate heat exchanger onto our site purified water distribution loop. The heat exchanger will function as a trim cooler maintaining the loop and tank temperature at 15 degC, it will also be used as a batch heater for thermal sanitisation at 85...