Can anyone provide the formula for the tension generated in a taut horizontal cable under the influence of a vertical load applied at mid-span. I know 'taut' is actually a function of initial installation tension with some resulting sag in the cable based on span and cable weight. I can...
Does anyone know of a simple way to calc. the capacity of a double layer of 4x12 lagging in a soldier beam installation? This is a cost issue. Researching 'beam on elastic foundation' leads only to finite element, differential eqn. solutions. There must be a simpler way. Thanks.
I read a very informative thread re: thrust blocks in jacking pits, but it has been closed. I'm designing a thrust block in a slide-rail-shored pit in which the lower panels will be raised, and the thrust block will bear horizontally on the soil, developing passive pressure. The transition has...
For designing soldier beam walls to retain backfill, I usually include an add-on pressure for compactive effort. Is this pressure residual, or, like traffic surchage, is it only present during actual backfill operations? I'm currently using a methodology from the Canadian Foundation Manual...
I must provide temporary underpinning support for a group of in-place "K" type OWJ's so their support beam can be replaced. The mfgr. and "model" No. are unknown. Is there a generic alternative support point on these OWJ's that I can use?
Are soil nails AS EFFECTIVE when drilled into old concrete slurry fill as when drilled into the weathered bedrock we thought was there ? This is under a structure which must be supported by the soil nail wall. If the concrete/slurry is NOT competent as a foundation mat'l., it'll have a failure...
First, my deep thanks to all respondants who helped with experiential insight re: wood lagging left in place. The compilation of replies helped turn the tide and, on this job, it will now be permitted.
Now, does anyone have a reference for development of active pressure values for bedrock...
As a shoring designer, I'm running into some clients and consultants who won't allow pressure treated (.4 pcf per AWPA guidelines) 3x12 DFir wood lagging to remain in the ground, citing potential voids and resulting soil subsidence. This is particularly problematic when the lagging is used as a...
I cannot find a combined active and passive pressure diagram for a single line of sheet piling driven into a river mudline to retain one-side hydrostatic load, only, above that mudline. They all show retained earth (shoreline bulkhead), even USS Manual and NAVDOCKS. Thanks for any direction...