Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: JCGOO7
  • Content: Threads
  • Order by date
  1. JCGOO7

    Chemical Injection.

    I need everyone's opinion on the effectiveness and long term duration of Chemical Injection to stabilize Eagle Ford Shale type soil with PVR of 7-10 inches and PI 52-60. Construction area is near the Dallas area. It is for residential purposes. Has anyone heard of ECSS 3000 (IS 2500)? How...
  2. JCGOO7

    FOUNDATION ON SOIL WITH PVR OF 7-10 INCHES

    I need information on the best foundation design for this type of soil. I do have a geotech engineer report. I have been given the following options and will like to know which is more effective and economical: removal and refill with select fill up to 60" and 15 foot piers, water or...

Part and Inventory Search